Equestrian Track Development - our process
Check out our international project portfolio
Geolastic Group
Our work stage by stage
-
1) Trenching to bury the pipe section
-
2) Placement of insulating canvas.
-
3) Insertion of pipes with buoys and solenoid valves.
-
4) Spreading of draining sand and laser alignment.
-
5) Extended and aligned final microsilica sand and laser aligned.
-
6) Fiber placement and subsequent material mixing
-
7) Track commissioning
Maintenance
Thanks to its automated system, track maintenance is minimized.
Once the track development work has been completed, proper training will be provided to the center's operators for its correct usage and maintenance, showing them how to keep the track in perfect condition at all times.
One of the advantages of Geolastic Group’s tracks is its geographical proximity, which means that for any detail or issue that may arise, we can intervene at the center within 24 hours after being notified.